Apologies To receive any apologies for absence from Councillors. Minutes: Apologies were received from Cllr Margaret Phipps, Cllr Joe Salmon and Ilva Kana.
|
|
|
Substitute Members To receive information on any changes in the membership of the Committee.
Note – When a member of a Committee is unable to attend a meeting of a Committee or Sub-Committee, the relevant Political Group Leader (or their nominated representative) may, by notice to the Monitoring Officer (or their nominated representative) prior to the meeting, appoint a substitute member from within the same Political Group. The contact details on the front of this agenda should be used for notifications.
Minutes: There were none.
|
|
|
Declarations of Interests Councillors are requested to declare any interests on items included in this agenda. Please refer to the workflow on the preceding page for guidance. Declarations received will be reported at the meeting. Minutes: There were none.
|
|
|
Confirmation of Minutes To confirm and sign as a correct record the minutes of the meetings held on 30 July and 3 September 2026. Additional documents: Minutes: The minutes of the meetings held on 30 July and 3 September 2026 were confirmed as an accurate record for the Chair to sign.
Voting: Unanimous
|
|
|
Recommendation and Action Tracker To consider any outstanding recommendations and actions from previous meetings. Minutes: The Chair reported on updates to the tracker since publication. It was agreed to include an action to ensure that an officer was assigned and notified as soon as a committee ‘deep dive’ was added to the forward plan.
|
|
|
Public Issues To receive any public questions, statements or petitions submitted in accordance with the Constitution. Further information on the requirements for submitting these is available to view at the following link:- https://democracy.bcpcouncil.gov.uk/ieListMeetings.aspx?CommitteeID=151&Info=1&bcr=1 The deadline for the submission of public questions is midday on Friday 9 October 2026 [midday 3 clear working days before the meeting]. The deadline for the submission of a statement is midday on Wednesday 14 October 2026 [midday the working day before the meeting]. The deadline for the submission of a petition is Thursday 1 October 2026 [10 working days before the meeting].
Minutes: The following public issues were received:
Agenda Item 6 – External Auditor Audit Progress and sector update 2025/26
Question from Philip Gatrell My earlier correspondence to this Committee’s Members evidences every Monitoring Officer’s “1989 Act” unequivocal Sections 5 and 5A duty to report maladministration and contraventions of law to each Councillor.
Commencing 22 July 2025 my public issues record Council’s unsuccessful judicial review regarding an Ombudsman’s “1974 Act” Maladministration Report and failed attempt to prevent its publication.
On 24 July 2025 the Report was presented to this Committee. The Ombudsman will confirm 1974 Act Reports cannot supplant 1989 Act reporting to Full Council.
Notified Constitution misstatements include:
• Only likely not actual contraventions of law are reported to Full Council under the 1989 Act and similarly • Maladministration is reportable only to Cabinet.
The above event of Maladministration was however incongruously exempted from public disclosure when Cabinet’s 26 March 2026 published documentation merely states “Adjudication Update”.
Do you as Chair on the attending Committee’s behalf agree these significant transparency and accountability failings warrant addition to the 2025/26 Annual Governance Statement ?
Response: It is not for me as Chair to give an opinion on behalf of other Committee members, nor of the Committee as a whole, in the response to a public question. Rather, the Committee will approve the 2025/26 Annual Governance Statement (AGS) as part of the approval of the Statement of Accounts, at this point there will be opportunity for members of the committee to agree or not, through recorded vote if necessary, the final AGS.
Agenda Item 9 – Procurement and Contract Management Strategy Delivery Plan (6-monthly progress report)
Question 1 from Ian Redman: My enquiries into the Hengistbury Head concession have identified several apparent breaches and control weaknesses, including procurement without adequate supporting records, an unexplained change from turnover to profit commission, income not invoiced or accrued, and a potential breach involving a £2,000 consultancy arrangement. Even low-value breaches matter because they may indicate that Financial Regulations are treated as optional when inconvenient. The Head of Audit and Management Assurance indicated that the identified breach would be reported. However, recording a breach does not necessarily mean corrective action follows. My concern is that, without effective enforcement and accountability, the same failures will recur. How many breaches of the Council’s Financial Regulations have resulted in disciplinary action against officers during the past 12 months?
Response: Officers do not agree with several elements of the questioner’s preamble to the question posed. With regard to the question posed, the number of breaches of financial regulations resulting in disciplinary action against officers is not a recorded outcome.
Question 2 from Ian Redman: What assurance can this Committee provide that breaches are investigated, corrective action is taken and officers are held accountable? Otherwise, what prevents the same failures from recurring?
Response: The annual report to the Audit & Governance Committee covering breaches of the Council’s Financial Regulations, has consistently outlined that all breaches are ... view the full minutes text for item 50. |
|
|
External Auditor – Audit Progress & Sector Update Grant Thornton, as the Council’s appointed External Auditors, has produced a report (Appendix A) which provides an update to the Audit & Governance Committee on their progress to date in delivering their responsibilities and provides an update on the following key areas of work: Financial Statements Audit 2025/26 • The Council published its draft financial statements on 12 June 2026, over two weeks ahead of the national deadline of 30 June 2026. This represents a positive achievement, reflecting the hard work of the finance team. • The audit is now just over two months into the planned timetable, with a similar period remaining before completion, and is required to be finalised by the end of November. • Overall, the External Auditor is satisfied with progress made to date and has no significant concerns to raise at this stage. • The External Auditor notes that the draft 2025/26 subsidiary accounts are not yet available and emphasises the need for this information to be made available in good time to facilitate timely audit review and assurance over the Group accounts; the Council should seek to provide this information earlier in future years. Value for Money Work • The audit assesses whether the Council has proper arrangements to secure economy, efficiency and effectiveness, as required by the 2020 Code of Audit Practice. • Work is structured around three areas: financial sustainability, governance, and improving economy, efficiency and effectiveness. • The External Auditor will report its findings to the Audit & Governance Committee in the interim Auditor’s Annual Report in December. Sector Updates The report also includes a summary of emerging national issues and developments that may be relevant to the Council.
Additional documents: Minutes: Roz Apperley of Grant Thornton, the Council’s External Auditor (EA), presented a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'A' to these Minutes in the Minute Book.
The report outlined Grant Thornton’s progress to date in delivering its responsibilities and provided an update on key areas of work including the financial statements audit 2025/26 and value for money work. The report also gave a summary of emerging national issues and developments in the sector. The Committee asked a number of questions about how the risk of unregistered placements in children’s social care was being mitigated by the Council, a national issue included in the sector update section of the report. Officers explained the governance arrangements in place to manage this risk. Members discussed the role of the committee in ensuring awareness of the risk and ensuring suitable challenge. There was assurance that the risk was being actively monitored by the relevant overview and scrutiny committee.
The Interim Chief Financial Officer confirmed that recently reported statistics in relation to the percentage of council tax collected were inaccurate and agreed to circulate the updated position to the committee. (ACTION)
RESOLVED that the Audit & Governance Committee notes the External Auditor’s progress to date in delivering their responsibilities and the sector update provided.
Voting: Agreed with no dissent.
|
|
|
Treasury Management Monitoring update for Quarter 2 2026/27 The report sets out the quarter two position for 2026/27 which forecasts an underspend of £1.1m due to lower than budgeted borrowing requirements, following the confirmed receipt of the Special Educational Needs and Disabilities (SEND) Recovery Grant. Minutes: The Finance Manager – Technical presented a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'B' to these Minutes in the Minute Book.
The report provided an update on the Quarter 2 position for 2026/27 in relation to treasury management activities. It included a summary of the current economic climate, an overview of the estimated performance of the treasury function, an update on the borrowing strategy, investments and compliance with prudential indicators. The Quarter 2 position forecast an underspend of £1.1m due to lower than budgeted borrowing requirements, following the confirmed receipt of the SEND (Special Educational Needs and Disabilities) Recovery Grant.
The Finance Manager and the Interim Chief Financial Officer responded to questions on the report, particularly around the SEND recovery grant. It was confirmed that the impact of the grant was already accounted for in the Council’s longer term financial planning. It was noted that the Committee’s forthcoming briefing on this subject would assist members in understanding the financial position in more detail and that it would be useful for all councillors to be invited. The Finance Manager responded to a question about the impact of the divergence shown in table 2 of the report in relation to PWLB historical rates information. It was agreed that it would be helpful for future reports to include a narrative to accompany this table. (ACTION)
RESOLVED that the Audit and Governance Committee notes the reported activity of the Treasury Management function for April to September 2026.
Voting: Agreed with no dissent
|
|
|
Risk Management - Corporate Risk Register Update This report updates councillors on the position of the council’s Corporate Risk Register. The main updates are as follows: • CR29 – Failure to manage the risks arising from property assets including Health and Safety risks. This is a new draft risk added during the quarter. • CR09 - We may fail to maintain a safe and balanced budget for the delivery of services, and managing the MTFP. The score for this risk has been reviewed and increased to reflect the current financial position. • Additional information has been included for this quarter in relation to each of the risk updates. Material updates are outlined in sections 13-15. Additional documents:
Minutes: The Risk and Insurance Manager presented a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'C' to these Minutes in the Minute Book.
This report provided a comprehensive update on the position of the Council’s Corporate Risk Register. The main updates were as follows: • CR29 – Failure to manage the risks arising from property assets including Health and Safety risks. This is a new draft risk added during the quarter. • CR09 - We may fail to maintain a safe and balanced budget for the delivery of services, and managing the MTFP. The score for this risk has been reviewed and increased to reflect the current financial position. • Additional information had been included for this quarter in relation to each of the risk updates. Material updates were outlined in sections 13-15.
The Committee received a more detailed update on two risks where members had sought further assurance. The Director of Education and Skills explained the role of the High Needs Block (HNB) Management Board in managing the Dedicated Schools Grant (DSG) deficit risk (CR23). The Board monitored demand, inclusion, sufficiency, placement patterns and expenditure against the assumptions in the SEND reform plan and recommended strategic action where required. The Director for Quality, Performance, Improvement, Governing and Commissioning explained the integrated framework in place to manage the safeguarding and service outcomes risk (CR02). Assurance was taken from sources including performance data, audits, supervision, feedback, provider oversight and external inspections. She referred to ongoing improvement work and mitigation measures to respond to the challenges of staff recruitment and retention. The Chair thanked the service directors for attending the meeting to provide the additional assurance requested.
Committee members commented on methods of risk scoring, levels of risk appetite and the value of the supporting narrative provided. Points raised in discussion included:
• Why the DSG risk score had not yet reduced despite investment - Members were advised that progress was dependent on the delivery of the SEND reform plan and future funding tranches. The distinction between historic debt and future expenditure was noted. • The role of the new risk app in providing a more integrated view of corporate risks across the whole Council. • Changes in risk over time - It was noted that there were other risk matrices available which could be considered in the annual policy review. Members welcomed the additional explanation on scoring and the narrative on progress provided by risk managers. • Consensus that a deep dive into lower-tier risk registers should be included on the forward plan to provide further assurance.
Officers were asked to give further consideration to whether exempt information breaches should be included in risk reporting and to clarify the links between risk management and budget setting (ACTION)
The work of the Standards Committee in reviewing procedures including repeated breaches of the Code of Conduct was also noted. The Chair agreed to liaise with the Chair of the Standards Committee about the concerns raised and potential follow-up actions, ... view the full minutes text for item 53. |
|
|
Procurement and Contract Management Strategy Delivery Plan (6-monthly progress report) Section 5.4. of BCP’s Procurement & Contract Management Strategy 2024 – 2028 describes a Delivery Plan approved by the Procurement and Contracts Board with progress reported to Audit and Governance at 6-month intervals. This report provides Audit & Governance Committee with an update on progress made in delivering the 57 commitments described within BCP’s Procurement and Contract Management Strategy 2024 - 2028. Additionally, this report provides Audit & Governance Committee with performance monitoring indicators for the nine measures described within Section 5.5 of BCP’s Procurement & Contract Management Strategy 2024 – 2028. Minutes: The Head of Procurement and Contract Management (PCM) presented a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'D' to these Minutes in the Minute Book.
The report provided an update on progress made during the second year of delivery of the Council’s Procurement and Contract Management Strategy 2024 - 2028. The update included information on the delivery of the 57 commitments described within the Strategy and the performance monitoring indicators for the nine measures described within Section 5.5 of the Strategy. The Committee was also advised of proposed training on the role of procurement for new members post May 2027 elections.
The Head of PCM responded to questions on the report. He explained that although there were no set targets for the nine measures, KPIs based on comparative data were set by and reported to the Procurement Management Board. Cllr M Tarling offered to follow this up with the Head of PCM to agree how much of this information to include in the next report (ACTION). It was noted that the use of proxies would be reviewed when the Strategy was next updated. The forthcoming presentation to committee would include a report to clarify the roles of procurement, concessions, licensing, etc.
The Committee had an initial discussion about the Council’s decisions on 13 October 2026 in respect of the Lease of Premises on Southbourne Promenade, one of which was to refer the procurement of the concession contract to the Audit and Governance Committee for independent review.
Officers advised that the role of the Public Procurement Review Service (PPRS) was to provide independent oversight and recommendations. It did not have the power to veto contract awards. It was noted that the PPRS review should be received before any Committee consideration, although related processes could run concurrently. Concerns were raised about public perception and the wording of the Council resolution. Members were assured that the references to the PPRS review, the Committee review and any potential appeal were not intended to be sequential or dependent on one another. It was agreed that the Committee’s work would need to be carefully scoped and timetabled to ensure its remit was clear and transparent, that it was informed by the PPRS outcome and did not prejudice any legal challenge. It was noted that concerns raised about the process included the definition of requirements in relation to the Council’s Seafront Strategy and the timing of the lease disposal.
The Committee was advised that the turnaround for PPRS findings was relatively quick and should therefore enable the item to be added to the Forward Plan for the next meeting on 10 December 2026.
Committee members were unhappy about receiving referrals from Council to approve prudential borrowing when the other key elements of the decision had already been made. Members agreed that such items should be timetabled in the correct sequence of Cabinet, Audit and Governance Committee and Council.
RESOLVED that
|
|
|
IT & Programmes Infrastructure Capital Investment Plan 2026–2032 This report was considered by Cabinet on 2 September 2026 and the following decisions were made:
“RESOLVED that Cabinet: - (a) approved delegated procurement authority to Director of IT & Programmes; (b) recommend to Audit and Governance Committee to recommend to Council to approve prudential borrowing of £11.2m to support delivery of the programme over 6 years.
It is RECOMMENDED that Cabinet recommend to Council: - (c) to approve the business case for the delivery of a multi-year IT Infrastructure Capital Investment Plan to maintain, modernise and continue to secure the Council’s core digital infrastructure. (d) to approve recommendation for capital budget allocation of £11.2m over the period 2026–2032 to fund core IT infrastructure and a rolling program of end-user laptop replacement. (e) to prioritise MTFP growth of £2.8 million over 6 years to fund the prudential borrowing cost of £11.2 million IT investment.”
The Audit and Governance Committee is asked to consider the above recommendation (b) in bold text. A copy of the Cabinet report is included for the Committee’s reference.
Additional documents:
Minutes: The Cabinet Member for Transformation, Resources and Governance introduced a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'E' to these Minutes in the Minute Book.
A report to approve the delivery of a multi-year IT Infrastructure Capital Investment Plan to maintain, modernise and secure the Council’s core digital infrastructure over the period 2026 to 2032 was considered by Cabinet on 2 September and Council on 13 October 2026. The Cabinet recommendation asked the Committee to recommend to Council the approval of prudential borrowing of £11.2m to support the delivery of the programme over 6 years. The Portfolio Holder acknowledged the comments made in the previous item around the timetabling of such recommendations.
The Interim Chief Financial Officer (CFO), the Director of IT and Programmes and the Head of IT Infrastructure responded to questions on the report. Members were reminded of the current governance arrangements which required such borrowing proposals to be referred to the committee. The Interim CFO confirmed that the proposed borrowing was affordable and relatively immaterial within the overall Council budget and would enable a longer-term strategic approach to be adopted. It was noted that the costs would become a standard budget provision in future years. The Committee heard that the programme followed a structured asset lifecycle approach, including infrastructure, cybersecurity, telephony and hardware. Borrowing was phased over six years and was based on a worst-case scenario. Officers assured members that spending requirements had been rigorously challenged.
Committee members discussed the operational and security risks of not approving the investment. Some members expressed concerns about the affordability of the proposal given the Council’s wider financial pressures. One suggestion was to defer making a decision until the 2026/27 budget position was clearer. The Portfolio Holder for Finance considered that deferral would only delay necessary expenditure. It was clarified that only the revenue costs were incorporated within the budget. Members were referred to the role of the Digital Working Group in providing ongoing oversight. The Interim CFO assured members that borrowing was currently restricted to essential expenditure and that robust challenge of the proposals would continue.
RECOMMENDED TO COUNCIL to approve prudential borrowing of £11.2 million to support delivery of the programme over 6 years.
Voting: For – 3, Against – 0, Abstain – 3 |
|
|
Internal Audit - Quarterly Audit Plan Update This report details progress made on delivery of the second quarter of the 2026/27 Audit Plan. This report highlights that: • Eight audit assignments have been finalised, including one ‘Partial’ audit opinion; • 24 audit assignments are in progress; • Progress against the audit plan is on track and will be materially delivered to support the Chief Internal Auditor’s annual audit opinion; • Six high and five medium priority recommendations have not been fully implemented by the original target date or agreed revised date (as at 30 September). Explanation has been received from the relevant Directors as to why these have not been completed.
The report explains the requirement for Internal Audit to have an External Quality Assessment (EQA) every five years in order to demonstrate compliance with the Global Internal Audit Standards (GIAS) and the approach taken by the Internal Audit team. Minutes: The Deputy Chief Internal Auditor (CIA) presented a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'F' to these Minutes in the Minute Book.
This report detailed progress made on delivery of the second quarter of the 2026/27 Audit Plan. It provided an update on the status of audit assignments and audit recommendations. It was noted that progress was on track and would be materially delivered to support the Chief Internal Auditor’s annual audit opinion. The report also outlined the requirement for Internal Audit to have an External Quality Assessment (EQA) every five years in order to demonstrate compliance with the Global Internal Audit Standards (GIAS) and the approach taken by the Internal Audit team.
The Committee considered appendix 1 of the report which listed audit recommendations not yet implemented. Members requested that the relevant service/corporate directors be asked to provide more detailed explanations for inclusion in the next quarterly report, on the following items: Schools Finance (2024/25/26), Linwood School (2023/24) and Developer Contributions (2023/24). It was noted that if further assurance was required directors could be asked to attend and report to committee.
The Head of Audit and Management Assurance confirmed that a new audit apprentice had started in post, following on from the success of previous apprenticeship appointments. The Committee suggested that consideration be given to sending an informative note to Corporate Management Board highlighting the success of apprenticeships in Internal Audit and advocating their recruitment in other areas of the Council. (ACTION)
RESOLVED that the Audit and Governance Committee
a) Notes progress made and issues arising on the delivery of the 2026/27 Internal Audit Plans. b) Notes the explanations provided for non-implemented recommendations (Appendix 1) and has determined those areas where further explanation and assurance from the Service / Corporate Director is required. c) Approves the approach to undertaking the External Quality Assessment during 2026/27 via a validated self-assessment.
Voting: Unanimous
|
|
|
Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2025/26 During 2025/26, Internal Audit delivered a comprehensive programme of counter fraud activity designed to strengthen the Council's resilience to fraud, corruption and financial irregularity. Activity included the review of key counter fraud policies, fraud awareness training and communications, targeted fraud risk audits, proactive data matching through the National Fraud Initiative (NFI), and the investigation of fraud referrals and financial irregularities. This work contributed to the identification and recovery of overpayments, the cancellation of blue badges and concessionary travel passes linked to deceased individuals, improved fraud prevention controls across several high-risk areas, and the promotion of fraud awareness through new public-facing communications.
Internal Audit investigated all allegations of suspected fraud, corruption and financial irregularity, proportionately and in accordance with established procedures during 2025/26. This included 371 fraud-related referrals and three formal whistleblowing referrals, with the latter investigated and concluded in accordance with the Council’s Whistleblowing Policy.
NOTE: In relation to this item of business, the Committee is asked to consider the following resolution in relation to any discussion on the exempt Appendices A and B to the report: “That under Section 100(A)(4) of the Local Government Act 1972, the public be excluded from the meeting for the following item of business on the grounds that it involves the likely disclosure of exempt information as defined in Paragraphs 1, 2 and 7 in Part I of Schedule 12A of the Act and that the public interest in withholding the information outweighs such interest in disclosing the information.”
Additional documents:
Minutes: The Deputy Chief Internal Auditor (CIA) presented a report, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'G' to these Minutes in the Minute Book.
The Deputy CIA outlined the key achievements of the counter fraud work carried out by Internal Audit during 2025/26 as set out in the report. This work was intended to strengthen the Council’s resilience to fraud, corruption and financial irregularity. He drew attention to the increase in staff awareness and guidance in relation to undeclared secondary employment and reported that no cases had been detected this year to date. He also referred to the increased level of fraud awareness training among employees which now stood at 90%. The report also included two exempt appendices which provided details of three formal whistleblowing referrals and thefts (or attempted thefts) of Council equipment report to the Insurance Team.
The Deputy CIA responded to questions on the report. He highlighted the emerging risk of AI enabled fraud. On the single person council tax discount and second homes premium, he explained that these were dealt with by the Revenue Team as business-as-usual activity. In terms of automating deceased records it was noted that the Council had a Tell Us Once service, although this was not able to cover every scenario. Officers clarified the breakdown of statistics in relation to Blue Badge referrals. It was agreed to review the presentation of referral statistics and accompanying explanation in future reports (ACTION).
RESOLVED that:
a) the counter fraud work & investigations carried out by Internal Audit during 2025/26 be noted; b) the whistleblowing referrals received during 2025/26 be noted.
Voting: Agreed with no dissent
|
|
|
Forward Plan (refresh) - For the 2026/27 municipal year This report sets out the reports to be considered by the Audit & Governance Committee during the 2026/27 municipal year to enable it to fulfil its terms of reference. Additional documents: Minutes: The Committee considered its forward plan of agenda items for the 2026/27 municipal year, a copy of which had been circulated to each Member and a copy of which appears as Appendix 'H' to these Minutes in the Minute Book.
The Chair confirmed that the following items would be added to the forward plan as agreed in discussion on earlier agenda items:
• Consideration of Council decision to refer the procurement of the concession contract for the premises on Southbourne Promenade to the Committee for independent review – 10 December 2026 • ‘Deep dive’ into lower level risk register hierarchy – subject area and date to be determined.
RESOLVED that the Audit & Governance Committee approves the Forward Plan for 2026/27, as set out at Appendix A.
Voting: Unanimous
|